Another Sectors

The raw material sector is one of the economic and social priorities of the economy. Therefore, innovations that improve the efficiency of production processes are of major importance today. From its establishment, BIPROMET has been undertaking the challenges of increasing capacity through design or modernization of technological lines. Within this scope, design and detail engineering is prepared, taking into account maintenance issues, replacement and restoration of an obsolete machine park, expansion of basic production facilities, as well as construction of new complex facilities and plants.

Significant technological and construction projects were implemented for the zinc-lead, copper and aluminium industries, where BIPROMET also undertook investments in the “turnkey” system, among others, construction of the Battery Scrap Processing Plant in Świętochłowice, modernization of Orzel Bialy Plant in Piekary, construction of the Hydroaluminium Plant in Chrzanów and Alupol in Tychy and Contirod Rolling Plant for KGHM Polska Miedź SA.. As a result of projects that improve the efficiency of technological lines, investors have increased production flexibility, reduced costs for materials and energy consumption, increased quality, and reduced harmfulness to the environment.

One of the most important examples of using BIPROMET's design-executive potential was its function as a General Investment Designer as part of the implementation of the comprehensive Pyrometallurgy Modernization Program in Głogów, conducted in 2010-2016 at KGHM Polska Miedź SA. The accomplished design task, in particular regarding the construction of the Electric Furnace, is assessed as a new generation in metallurgical aggregates. BIPROMET implemented an original solution, i.e. an innovative installation of post-combustion, cooling of process gases and very efficient cleaning of process gas in Głogów Copper Smelter.

Process Discipline Mechanical and Technological Discipline Structural and Architectural Discipline Installation Discipline Electrical and Automation Discipline Environmental Protection

Process Discipline

We carry out design works in the field of extraction metallurgy, pyrometallurgy and metal ...

Mechanical and Technological Discipline

We prepare technological and structural designs for specialist industrial installations with a focus on working ...

Structural and Architectural Discipline

We develop construction and assembly documentation for industry, housing, bank and supermarket complexes and ...

Installation Discipline

Our design documentation we create on the basis of a 3D model, which greatly reduces ...

Electrical and Automation Discipline

We implement tasks in the area of designing complex control systems and automation of ...

Environmental Protection

We enable companies to introduce innovative solutions in the field of efficient management of raw ...
Analyses and pre-investment concepts Comprehensive design and engineering documentation Supply and assembly of key machinery and equipment General implementation of “turnkey” investments Contract Engineer Services Training, start-ups and acceptance

Analyses and pre-investment concepts

This stage requires a very detailed analysis of needs and expectations of future users of ...

Comprehensive design and engineering documentation

We prepare design documentation that includes technical drawings and a detailed description of work on ...

Supply and assembly of key machinery and equipment

As part of investment implementation, BIPROMET carries out a complete supply of machinery and equipment, ...

General implementation of “turnkey” investments

In its organizational structure, apart from the Design Department, BIPROMET also has a General Investment ...

Contract Engineer Services

Diversification of the operational activities of BIPROMET has allowed us to gain unique competence on ...

Training, start-ups and acceptance

We prepare start-up documentation and operating instructions at the stage of commissioning of an ...

General PMP Investment Designer

20,000 tons - total weight of steel structures

20,000 tons - total weight of steel structures

13 000 tons - steel structure of the main building

13 000 tons - steel structure of the main building

3 500 - tonne design a slurry furnace

3 500 - tonne design a slurry furnace

350 000 - m3 total design volume the complex of the object

350 000 - m3 total design volume the complex of the object